File #: 17-634    Version: 1
Type: Change Order & Work Order Status: Passed
File created: 8/11/2017 In control: City Council
On agenda: 10/3/2017 Final action:
Title: Approve the Award of Change Order #1 to Contract 16-353, Consulting Engineering Services for Soils and Materials Testing, to Midland Standard Engineering for an amount not to exceed $36,541 and a total award of $277,000.
Attachments: 1. Project Page - MP004.pdf, 2. Project Page - MP009.pdf, 3. Project Page - WU04.pdf, 4. 16-353 Council Recommend.pdf
Related files: 17-382, 22-0116
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
CITY COUNCIL AGENDA ITEM

ACTION REQUESTED:
title
Approve the Award of Change Order #1 to Contract 16-353, Consulting Engineering Services for Soils and Materials Testing, to Midland Standard Engineering for an amount not to exceed $36,541 and a total award of $277,000.
body

DEPARTMENT: Water Utilities

SUBMITTED BY: James Holzapfel, Director

BOARD/COMMISSION REVIEW:
N/A

BACKGROUND:
On January 17, 2017, City Council approved the award of Contract 16-353, Consulting Engineering Services for Soils and Materials Testing to Midland Standard Engineering (Midland) in the amount of $240,000. The Water Utilities, Transportation and Engineering Development Business Group and Department of Public Works employ the geotechnical services of Midland on various capital improvement projects, including sidewalk and curb replacements (MP004), street maintenance improvements (MP009) and water distribution system rehabilitations and replacements (WU04).

On June 6, 2017 City Council approved the award of Contract 17-129, South Central Interceptor Sewer Hardening and Protection Engineering Design to Strand Associates (Strand). This contract included the following engineering services:
a) Provide field survey, tree inventory and hydraulic modeling services.
b) Perform design analysis for the sewer hardening and streambank stabilization.
c) Prepare engineering plans and contract documents to bid the construction portion of the project.

As part of their engineering work, Strand Associates determined that a geotechnical investigation is necessary to complete the final design of the various proposed streambank stabilization alternatives. The geotechnical investigation will determine the suitability of the underlying soil conditions and recommend appropriate foundations to provide for the long-term stability of each location. This geotechnical investigation work was not planned during the preparation of the Request for Proposals for Contracts 16-353 and 17-129. However, this work...

Click here for full text