File #: 24-0255    Version: 1
Type: BID, RFP, RFQ, COOP, SOLE SOURCE, OPTION YEAR Status: Passed
File created: 2/27/2024 In control: City Council
On agenda: 3/19/2024 Final action: 3/19/2024
Title: Approve the award of Bid 23-250, Northeast Waterworks Standpipe Rehabilitation Project, to ERA-Valdivia Contractors, Inc. for an amount not to exceed $1,632,075, plus a 3% contingency

CITY COUNCIL AGENDA ITEM

 

ACTION REQUESTED:
title

Approve the award of Bid 23-250, Northeast Waterworks Standpipe Rehabilitation Project, to ERA-Valdivia Contractors, Inc. for an amount not to exceed $1,632,075, plus a 3% contingency

body

 

DEPARTMENT:  Water Utilities

 

SUBMITTED BY:  Darrell Blenniss, Director of Water Utilities

 

BOARD/COMMISSION REVIEW:
N/A

 

BACKGROUND:

In 1968, the two-million-gallon standpipe at the Northeast Waterworks (NEWW) was constructed. In 2016, the standpipe exterior was spot treated and overcoated. In 2004, the interior was spot coated. These coatings have exceeded their life expectancy and surfaces now need to be cleaned to bare metal and recoated.

 

On August 24, 2023, KLM Engineering, Inc. (KLM), an independent third-party engineering firm, inspected the NEWW standpipe. The inspection revealed deterioration of the interior and exterior surface coatings with numerous failures exposing the structure to corrosion and rust. Safety and structural repairs were also identified and recommended for completion while the standpipe is out of service for painting.

 

Based on KLM’s inspection and a consultation with Sherwin-Williams Company, staff determined that the painting and repairs be completed to preserve the integrity of this critical asset. KLM recommends the following:

 

1. Exterior surface to be abrasive blast cleaned to SSPC-SP 10 condition and primed and coated with a zinc epoxy urethane coating system.

2. Logos to be applied over the new exterior surface coating with a urethane coating system.

3. Exterior standpipe wall within PAS 15D to be abrasive blast cleaned to SSPC-SP 10 condition and primed and coated with a zinc insulative coating system.

4. Dry interior/access pallister surface to be abrasive blast cleaned to SSPC-SP 10 condition and primed and coated with a zinc epoxy coating system.

5. Wet interior surfaces to be abrasive blast cleaned to SSPC-SP 10 condition and primed and coated with a zinc epoxy coating system.

6. Concrete foundation to be repaired to SSPC-SP 13 condition and coated with an epoxy coating system.

 

 KLM also recommends items for repair, replacement, and installation such as antennae penetrations, metal work, manways, vents, fall protection, and lighting.

 

Staff concurs with the KLM recommendations as well as performing additional repair such as roof flashing, level measuring instrumentation, and SCADA/PLC programming.

 

DISCUSSION:

In February 2024, the Water Utilities issued Bid 23-250, for the Northeast Waterworks Standpipe Rehabilitation, located at 1593 Naperville-Wheaton Road.

 

Advertisement Date:

 2/2/2024

Notices Sent:

 392

Opening Date:

 2/2/2024

Planholders:

 15

 

 

Proposals Received:

 3

 

Bids were received from the following vendors:

 

Firm Name

Total Bid Amount

ERA-Valdivia Contractors, Inc.

$1,632,075

Engineer’s Estimate

$1,751,370

Neumann Co. Contractors

$2,187,800

Tecorp, Inc.

$2,794,700

 

 

 

Staff recommends awarding the bid to the lowest responsive bidder ERA-Valdivia Contractors, Inc. ERA-Valdivia Contractors, Inc. is an Illinois-licensed and bonded painting contractor that will provide the necessary labor, materials, and equipment for the rehabilitation and painting of the NEWW standpipe.

 

The term of the contract is from the date of award through final completion date of December 31, 2024. The contract includes a two-year warranty inspection after completion to identify and address any coating failures that may need repairs.

 

FISCAL IMPACT:

CIP#: WU050 - NEWW Standpipe Rehabilitation

 

Rehabilitation of the standpipe at the NEWW is expensed to the account number listed below as part of the capital improvement program. The project is funded at $2.0 million for 2024. The requested award, including the contingency amount, is within the budget.

 

Account Number

Fund Description

Total Budget Amount

41252000-551502

Water Capital Fund

$40,264,902

 

Per Council directive, contingency on construction projects is set at 3% on projects over $500,000 and 5% on projects under $500,000.