File #: 24-0133    Version: 1
Type: BID, RFP, RFQ, COOP, SOLE SOURCE, OPTION YEAR Status: Passed
File created: 1/30/2024 In control: City Council
On agenda: 3/19/2024 Final action: 3/19/2024
Title: Approve the award of Bid 23-217, Northwest Waterworks Improvements - Phase II, to Dahme Mechanical Industries for an amount not to exceed $1,188,888, plus a 3% contingency
CITY COUNCIL AGENDA ITEM

ACTION REQUESTED:
title
Approve the award of Bid 23-217, Northwest Waterworks Improvements - Phase II, to Dahme Mechanical Industries for an amount not to exceed $1,188,888, plus a 3% contingency
body

DEPARTMENT: Water Utilities

SUBMITTED BY: Darrell Blenniss, Director

BOARD/COMMISSION REVIEW:
N/A

BACKGROUND:
The rehabilitation of the Northwest Waterworks Station, located at 1608 W. Diehl Road, began in 2020 with the installation of variable frequency drives (VFD) on the two 350 HP pumps (numbers one and three) and associated mechanical piping improvements. The remaining pump numbers two, four and five are without VFDs and have pipes and valves that are reaching the end of service life.

In December 2023, the Water Utilities issued Bid 23-217, Northwest Waterworks Improvements - Phase II which includes the installation of VFDs for the three remaining pumps, replacing aged pipes and valves, lighting upgrades, and associated SCADA improvements. The work also includes the installation of associated electrical conduits, wires and concrete pads.

DISCUSSION:

Advertisement Date: 12/7/2023 Notices Sent: 901
Bid Opening Date: 1/30/2024 Planholders: 49
Proposals Received: 2

Bids were received from the following vendors:

Vendors Name
Proposed Cost
Dahme Mechanical Industries
$1,188,888
Engineer's Estimate
$1,250,000
Sheridan Plumbing & Sewer
$1,309,800

Dahme Mechanical Industries has completed several successful projects for the City in the past, and the staff is confident in their ability to perform the work as specified.

This is a planned 2025 CIP project. Due to continuing supply chain issues and delays in receiving equipment, staff recommends awarding this project in 2024 to allow enough time for the contractor to prepare shop drawings, for City staff to review the shop drawings, and for the equipment to be ordered. The actual construc...