File #: 23-1238    Version: 1
Type: BID, RFP, RFQ, COOP, SOLE SOURCE, OPTION YEAR Status: Agenda Ready
File created: 10/25/2023 In control: City Manager Procurement Awards
On agenda: 11/1/2023 Final action:
Title: Approve award of Cooperative Procurement 23-284, 2023 Northeast Waterworks Roofing Project, to Garland/DBS, Inc. for an amount not to exceed $40,233, plus a 5% contingency
Related files: 24-0210
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
CITY MANAGER AUTHORITY PROCUREMENT AWARDS

ACTION REQUESTED:
title
Approve award of Cooperative Procurement 23-284, 2023 Northeast Waterworks Roofing Project, to Garland/DBS, Inc. for an amount not to exceed $40,233, plus a 5% contingency
body

DEPARTMENT: Water Utilities

SUBMITTED BY: Darrell Blenniss

BACKGROUND:
Water Utilities - Northeast Waterworks (NEWW) / Pressure Adjusting Station 15D (PAS 15D) Standpipe located at 1593 Naperville-Wheaton Road, Naperville Illinois houses a Water Supply Pumping Station, Pressure Adjusting Station (PAS-15D), Emergency power generation, Emergency Back-up Well 24, and a 2.0 Million Gallon Standpipe. Water Utilities recently decommissioned the NEWW Emergency Power Generator, removed it from inside of the Pump House, and installed its replacement outside of the facility. Removal of the old Generator did not include roof repairs that are needed to remove the old Generator's exhaust stack and fresh air louvers. The stack and louvers need to be removed and their cavities, in the roof, repaired to seal for security and protect from rain, snow cold. Blistering in the roof will also be corrected at this time.

DISCUSSION:
Water Utilities has determined that Garland/DBS, Inc. is best suited to repair this roof, at NEWW, to secure and protect from elements. Garland/DBS, Inc. provided according with pricing established under a Master Intergovernmental Cooperative Purchasing Agreement (MICPA # PW1925) with Racine County, WI and OMNIA Partners, Public Sector (U.S. Communities). Garland/DBS, Inc. administered a competitive process to obtain quotes for the project. If Garland/DBS, Inc. is not awarded this work NEWW would remain unsecure and vulnerable to environmental conditions and Water Utilities will need to proceed with a formal bid process to accomplish this work. Due to complications with work needed to the front of the Pump House building that portion of repairs have been withdrawn from this project and will be completed separatel...