File #: 23-0911    Version: 1
Type: Change Order & Work Order Status: Agenda Ready
File created: 7/31/2023 In control: City Council
On agenda: 8/15/2023 Final action:
Title: Approve the award of Change Order #1 to Option Year One of Contract 22-058, Storm Sewer Lining, to Hoerr Construction for an amount not to exceed $75,000 for a total award amount of $725,000
Related files: 22-0185, 24-0190
CITY COUNCIL AGENDA ITEM

ACTION REQUESTED:
title
Approve the award of Change Order #1 to Option Year One of Contract 22-058, Storm Sewer Lining, to Hoerr Construction for an amount not to exceed $75,000 for a total award amount of $725,000
body

DEPARTMENT: Department of Public Works

SUBMITTED BY: Richard Dublinski, Director

BOARD/COMMISSION REVIEW:
N/A

BACKGROUND:
The Department of Public Works (DPW) maintains the City's system of storm sewers. Storm sewers have a functional lifespan of approximately 75 years. As a storm sewer ages, the pipes develop cracks caused by material degradation, soil settlement, root intrusion, and/or adjacent construction. When a segment of storm sewer approaches the end of its useful life, the extent and severity of pipe degradation results in a high probability for pipe/system failure. Pipe failure may cause sinkholes in roadway surfaces and may also result in flooding of homes, businesses and/or public rights-of-way. The City has relined approximately 240,000 linear feet of pipe since the inception of the Storm Sewer Lining Program (SW017) in 2004, which has led to a reduction in localized flooding and related complaints.

In February 2022, the City Council awarded Bid 22-058, Storm Sewer Lining, to Hoerr Construction for the rehabilitation of storm sewer by the installation of cured-in-place pipe (CIPP). The term of the initial contract was for seven months from date of award to October 15, 2022 with two, one-year options to extend. In September 2022, change orders one and two were awarded to add additional funds to the original contract term. In February 2023, the City Council awarded Option Year One with a term of April 1, 2023 to March 31, 2024 with one additional option year to extend.

The contract includes a pre-inspection and cleaning of all pipes, the installation of CIPP, and the inspection of each completed installation by closed circuit television. The term of this contract was for seven months from date of a...