File #: 22-0495    Version: 1
Type: BID, RFP, RFQ, COOP, SOLE SOURCE, OPTION YEAR Status: Passed
File created: 4/13/2022 In control: City Council
On agenda: 5/3/2022 Final action: 5/3/2022
Title: Approve the award of Bid 22-009, T10 McDowell Trunk Sewer Rehabilitation Phase 1, to National Power Rodding Corporation for an amount not to exceed $1,435,192, plus a 3% contingency
Attachments: 1. WW006
CITY COUNCIL AGENDA ITEM

ACTION REQUESTED:
title
Approve the award of Bid 22-009, T10 McDowell Trunk Sewer Rehabilitation Phase 1, to National Power Rodding Corporation for an amount not to exceed $1,435,192, plus a 3% contingency
body

DEPARTMENT: Water Utilities

SUBMITTED BY: Darrell Blenniss, Director

BOARD/COMMISSION REVIEW:
N/A

BACKGROUND:
The T10 McDowell Trunk Sewer transfers wastewater from the northwest portions of the city to the Northwest Pump Station at 511 N. River Road. In 2020, the Water Utilities performed an internal condition assessment of this asset and discovered many areas of pipe deterioration, cracks, and groundwater leaks. Also, all manholes related to the trunk sewer were inspected and are in the same condition as the trunk sewer.

In March 2022, the Water Utilities issued Bid 22-009, T10 McDowell Trunk Sewer Rehabilitation Phase 1. The contractor will rehabilitate 4,236 feet of existing 24-inch and 27-inch reinforced concrete pipe sanitary trunk sewer by installing resin-saturated felt lining cured with steam or hot water (CIPP) as per ASTM F1216-09. The finished product is a monolithic structural pipe formed to the existing host pipe.

The bid also includes the rehabilitation of 15 sanitary sewer manholes and the chemical grouting of 20 service laterals. This work is to be done in conjunction with CIPP lining.

The T10 McDowell Trunk Sewer Rehabilitation Phase 1 project is part of the City's IEPA-required 10-year wastewater collection rehabilitation plan, as well as the IEPA required 10-year infiltration and inflow reduction plan to reduce wastewater backups during heavy rain events.

DISCUSSION:
Advertisement Date: 3/18/2022 Notices Sent: 303
Bid Opening Date: 4/13/2022 Planholders: 25
Proposals Received:|910|
Proposals were received from the following vendors:

Firm Name
Proposed Cost
Engineers Estimate
$1,400,000
National Power Rodding Corporation
$1,435,192
Michaels Corporation
$1,499,099
Visu-sewer Clean and ...