File #: 22-0343    Version: 1
Type: BID, RFP, RFQ, COOP, SOLE SOURCE, OPTION YEAR Status: Agenda Ready
File created: 3/6/2022 In control: City Council
On agenda: 4/19/2022 Final action:
Title: Approve the award of Bid 22-020, Summerfield Lift Station Rehabilitation, to Marc Kresmery Construction, LLC. for an amount not to exceed $433,500, plus a 5% contingency
Attachments: 1. WW034
CITY COUNCIL AGENDA ITEM

ACTION REQUESTED:
title
Approve the award of Bid 22-020, Summerfield Lift Station Rehabilitation, to Marc Kresmery Construction, LLC. for an amount not to exceed $433,500, plus a 5% contingency
body

DEPARTMENT: Water Utilities

SUBMITTED BY: Darrell Blenniss, Director

BOARD/COMMISSION REVIEW:
N/A

BACKGROUND:
The Summerfield Lift Station was installed in 1994 and includes a dry well and valve well, two five-horsepower submersible sanitary pumps, one backup generator and one motor control center. The design flow rate is 280 gallons per minute with a maximum capacity of 380 gallons per minute. The lift station serves approximately 93 acres and 1,100 people. Due to aging equipment, the lift station is due for rehabilitation to ensure safe and reliable wastewater conveyance.

In March 2022, the Water Utilities issued Bid 22-020, Summerfield Lift Station Rehabilitation. The project will replace the existing standby generator, automatic transfer switch and associated cables, conduits, control and monitor system. The project also includes replacing existing sewerage pumps, guide rails and well hatches, installation of a mixer and upgrading the associated control system, wires, and conduits. Work also includes the installation of variable frequency drive systems, a new control enclosure and associated outside earthwork and concrete pads.

DISCUSSION:
Advertise Date: 3/02/2022 Notices Sent: 69
Bid Opening: 3/25/2022 Planholders: 27
Proposals Received:|910|
Bids were received from the following vendors:

Vendors Name
Proposed Cost
Marc Kresmery Construction LLC
$433,500.00
Engineer's Estimate
$525,000.00
Dahme Mechanical Industries
$678,888.88

Integral Construction attended the pre-bid meeting but did not submit a bid. The Integral Construction estimator informed Procurement Staff they had two other larger bids due on the same date and would not be able to complete the project. Integral Construction did provide an estimate...