File #: 22-0198    Version: 1
Type: BID, RFP, RFQ, COOP, SOLE SOURCE, OPTION YEAR Status: Passed
File created: 2/3/2022 In control: City Council
On agenda: 2/15/2022 Final action: 2/15/2022
Title: Approve the award of RFP 21-355, Tollway Substation Reliability Upgrade, to Sargent & Lundy, LLC for an amount not to exceed $339,240
Attachments: 1. EU086 - 2022
Related files: 23-1060
CITY COUNCIL AGENDA ITEM

ACTION REQUESTED:
title
Approve the award of RFP 21-355, Tollway Substation Reliability Upgrade, to Sargent & Lundy, LLC for an amount not to exceed $339,240
body

DEPARTMENT: Electric Utility

SUBMITTED BY: Brian Groth, Director

BOARD/COMMISSION REVIEW:
N/A

BACKGROUND:
The Naperville Electric Utility (Utility) Tollway Substation has experienced several 34.5kV bus flashovers in the past few years. These flashovers cause extended outages to critical industrial and commercial customers located along the I-88 corridor. The primary cause of these failures has been determined to be related to salt contamination from the adjacent I-88 tollway. Regular cleaning of the bus has proven ineffective at preventing the flashovers and requires labor intensive periodic maintenance. By relocating the 34.5kV bus indoors, the Utility will eliminate the primary cause of failures, improving reliability and reducing maintenance efforts.

In addition, one of the transformers connected to the 34.5kV bus at the Tollway substation does not allow for voltage regulation. By retiring this transformer and installing a new transformer at the substation the Utility can gain operational flexibility.

Finally, two out of the five 138kV breakers at the Tollway substation have reached end of life. Both breakers are slated for replacement allowing the Utility to gain much needed spare parts and initiate the process of phasing out these style of circuit breakers from the system.

The complexity of the design scope warrants the use of an outside consultant experienced in brown field substation design. In October 2021, the Electric Utility issued RFP 21-355, Tollway Substation Reliability Upgrade, to obtain an experienced and qualified design engineering firm to complete engineering design, construction support, and as-built incorporation to address the above concerns.

DISCUSSION:

Advertisement Date:
10/19/2021
Notices Sent:
228
Opening Date:
11/10/2021
Planholders:
2...

Click here for full text