File #: 19-590    Version: 1
Type: BID, RFP, RFQ, COOP, SOLE SOURCE, OPTION YEAR Status: Agenda Ready
File created: 5/31/2019 In control: City Council
On agenda: 7/16/2019 Final action:
Title: Approve the award of Sole Source Procurement 19-190, Three Floway Vertical Turbine Pumps, to Flow-Technics, Inc for an amount not to exceed $132,831
Attachments: 1. CIP Page
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
CITY COUNCIL AGENDA ITEM

ACTION REQUESTED:
title
Approve the award of Sole Source Procurement 19-190, Three Floway Vertical Turbine Pumps, to Flow-Technics, Inc for an amount not to exceed $132,831
body

DEPARTMENT: Water Utilities

SUBMITTED BY: Darrell Blenniss, Director

BOARD/COMMISSION REVIEW:
N/A

BACKGROUND:
The South Waterworks site is responsible for distributing Lake Michigan water from the DuPage Water Commission into the City's water distribution system. South Waterworks, originally constructed in 1987, requires improvements to the existing pumping equipment. All three pumps are showing significant signs of deterioration, as well as the valving and electrical equipment.

To prevent equipment failure and service interruption, the Water Utilities conducted RFP 19-155, South Waterworks Improvements, to hire a consultant to perform design engineering services and prepare the construction documents necessary to improve the facility. In March 2019, the City Manager approved the award of RFP 19-055 to Crawford, Murphy & Tilly (CMT). The South Waterworks improvements will include upgrades to the existing pumping equipment, variable frequency drives (VFD), instrumentation and controls, valves and piping, HVAC and the chlorine system

As part of the engineering services, CMT was responsible for evaluating various pump manufacturers, including Taco, Goulds, FlowServe and Floway. The pumps were evaluated for feasibility for the project based upon lead time, efficiency, discharge diameter, serviceability, cost and compatible pump and system curves. As a result of the evaluation, CMT recommended the use of Floway vertical turbine pumps.

DISCUSSION:
A sole source is requested for the purchase of three Weir Flow Control Floway vertical turbine pumps. Because the lead time for the pumps is 16-20 weeks, staff recommends purchasing the pumps in advance of hiring a contractor to perform the improvements so that the pump lead time does not delay the contra...