ACTION REQUESTED:
title
Approve the award of Option Year One to Contract 16-244, Cable Injection Services, to Novinium, Inc. for an amount not to exceed $1,300,000
body

DEPARTMENT: Electric Utility

SUBMITTED BY: Lucy Podlesny, Deputy Director

BOARD/COMMISSION REVIEW:
N/A

BACKGROUND:
Cable injection has proven to be a viable component of asset management for the utility. It is a cost-effective measure in maintaining the reliability and longevity of the underground electrical system. This has become more evident when used in our residential areas where the underground conductors were initially installed over 30 years ago. These areas are experiencing an increase in power outages due to deteriorating insulation on conductors nearing the end of their life span. Replacing the aged failing conductors with new conductors would require extensive construction, either via very intrusive open trenching or less intrusive, but more expensive, directional boring. This construction and cost can be avoided by injecting the cable with the patented fluid that rejuvenates the cable insulation into an almost new condition, providing an extended life to the cable and a 25-year warranty against failure.

The utility has used this technology in areas that include Wil-O-Way, University Heights, Brook Crossings, Columbia Estates, Pembroke Greens, Hobson Village, Hunters Woods, Countryside, Buttonwood, Brookdale, and Hobson West Subdivisions. These areas were prioritized based upon rate of cable failures, number of customers affected, outage length, and other reliability metrics.

On June 21, 2016, the City awarded Contract 16-244 to Novinium, Inc. in the amount of $2,000,000 for a three-year period, with two one-year options. In 2018, a change order was approved to provide an additional $1,600,000. To date, approximately $2.6 million has been expensed for this project. It is anticipated that another $250,000 will be expended before the end of the c...