File #: 19-281    Version: 1
Type: BID, RFP, RFQ, COOP, SOLE SOURCE, OPTION YEAR Status: Agenda Ready
File created: 3/12/2019 In control: City Council
On agenda: 4/16/2019 Final action:
Title: Approve the award of Bid 19-005, 2019 Micro-surfacing Program, to Microsurfacing Contractors LLC for an amount not to exceed $967,052, plus a 3% contingency
Attachments: 1. CIP Page, 2. 2019 Micro Locations
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
CITY COUNCIL AGENDA ITEM

ACTION REQUESTED:
title
Approve the award of Bid 19-005, 2019 Micro-surfacing Program, to Microsurfacing Contractors LLC for an amount not to exceed $967,052, plus a 3% contingency
body

DEPARTMENT: Transportation, Engineering and Development

SUBMITTED BY: William J. Novack, Director

BOARD/COMMISSION REVIEW:
N/A

BACKGROUND:
In March 2019, the Transportation, Engineering and Development (TED) Business Group issued Bid 19-005 seeking a contractor to perform micro-surfacing and thermoplastic pavement marking removal and replacement in various locations throughout the City. This is an annual program to significantly extend the life of pavement. The City will micro-surface and restripe 9.5 miles of roadway throughout the City limits, including the auto test track. The streets highlighted in red on the attached map will be micro-surfaced in 2019.

DISCUSSION:

Advertisement Date:
03/05/19
Notices Sent:
84
Opening Date:
03/25/19
Planholders:
8


Proposals Received:
2

Bids were received from the following vendors:

Vendor Name
Alternative 1 Cost
Alternative 2 Cost
Microsurfacing Contractors LLC
$953,551.20
$967,052.00
A.C. Pavement Striping Co.
$1,027,392.50
$1,085,892.50
Engineer's Estimate
$1,167,670.00
$1,210,420.00

The City's test track has areas containing a specialized high friction surface. This high friction surface area cannot be micro-surfaced over due to its unique properties. The area is not large enough to hire a specialized contractor to apply the product, so the high friction product was bid as an alternative.

* Alternative #1 included all the standard construction items that historically have been associated with this contract.
* Alternative #2 includes all the standard construction items that historically have been associated with this contract plus an additional line item for the application of the high friction surface product.


The engineer's estimate is based on unit prices obtained from the 2017 and 2018 M...