File #: 18-1121    Version: 1
Type: Report Status: Referred
File created: 12/13/2018 In control: Building Review Board
On agenda: 12/19/2018 Final action: 12/19/2018
Title: Consider the requested variance to the 2012 International Building Code Section 402.1.1 Open Space - BRB Case #97.
Attachments: 1. BRB#97 Application - Mall of India
BUILDING REVIEW BOARD AGENDA ITEM

ACTION REQUESTED:
title
Consider the requested variance to the 2012 International Building Code Section 402.1.1 Open Space - BRB Case #97.
body

DEPARTMENT: Transportation, Engineering and Development

SUBMITTED BY: Peter Zibble, Operations Manager

BOARD/COMMISSION REVIEW:
The BRB will consider this request at their December 19, 2018 meeting.

BACKGROUND:
The applicant is seeking to modify the property at 776 S. Route 59 (formerly Walmart) into a covered mall. An anchor building of a mall is defined as an exterior perimeter building having direct access to a covered mall building, but having separate means of egress (2012 IBC 202). The mall has currently identified a grocery tenant (G-1) to serve as an anchor building; it has direct access to the covered mall along with an independent means of egress; this space is in compliance with the code. To the north of the grocery anchor, there is a tenant space YY that has no connection to the mall. In the IBC, malls are found under Chapter 4 - Special Detailed Requirements Based on Use and Occupancy. As part of the mall requirements, the mall building and attached anchor stores shall be surrounded on all sides by a permanent open space or not less than 60 feet. Due to this Tenant Space YY not opening to the mall and not qualifying as an anchor store, this open space is not able to be met at the location of Tenant Space YY.

DISCUSSION:
The applicant has requested a variance to 2012 IBC 402.1.1 - Open Space (required 60 feet of permanent open space around the mall). Tenant Space YY cannot be considered part of the mall due to its inability to connect internally with the mall therefore not allowing for the required open space to be met around the mall at its location.

The applicant met with staff on 11/9/2018 to discuss the project. As indicated at the meeting, staff is supportive of such a variance request given the following conditions are met:
1. A fire barrier with a fire-...

Click here for full text