File #: 17-693C    Version: 1
Type: Report Status: Passed
File created: 11/8/2017 In control: City Council
On agenda: 11/21/2017 Final action: 11/21/2017
Title: Approve the revised 2018 Annual New Sidewalk Program consisting of Chicago Avenue/Julian Street, Eagle Street, Loomis Street, Willow Road, and Book Road at a City cost of $155,000.
Attachments: 1. Annual New Sidewalk Program - Priority Factors.pdf, 2. Annual New Sidewalk Program - Near-Term List.pdf, 3. TAB Minutes July 6, 2017.pdf, 4. Annual New Sidewalk Program Resident Correspondence.pdf, 5. Annual New Sidewalk Program - 2018 Location Maps.pdf, 6. Draft TAB Minutes September 7, 2017.pdf
Related files: 17-693B, 17-693

CITY COUNCIL AGENDA ITEM

 

ACTION REQUESTED:
title

Approve the revised 2018 Annual New Sidewalk Program consisting of Chicago Avenue/Julian Street, Eagle Street, Loomis Street, Willow Road, and Book Road at a City cost of $155,000.

body

 

DEPARTMENT:                     Transportation, Engineering and Development

 

SUBMITTED BY:                     Kelly Dunne, Project Engineer

 

BOARD/COMMISSION REVIEW:
On September 7, 2017, the Transportation Advisory Board (TAB) recommended approval of the 2018 Annual New Sidewalk Program, (Approved 8-1).

 

BACKGROUND:

On January 6, 2004, City Council approved the Comprehensive Sidewalk Policy, a policy and guideline for sidewalk installation and maintenance within Naperville’s corporate boundaries.  The policy assists City Council, the Transportation Advisory Board (TAB), staff and residents by clearly defining the City’s policies and practices for sidewalk installation.

 

The policy established the Annual New Sidewalk Program to programmatically install sidewalk in identified gap locations.  Each year, a list of selected gap locations is presented to TAB and City Council for inclusion in the following year’s construction program.  Since 2004, sidewalk has been installed in 108 gap locations, totaling approximately 12.8 miles.

 

Based on an inventory of existing sidewalk gaps throughout the City, the following gaps remain uninstalled and planned for future construction programs.

 

 

Number of Gaps

Total Length of Gaps

Arterial Roadways

45

19 miles

Non-Arterial Roadways

241

32 miles

Total

286

51 miles

 

The approximately 51 miles of sidewalk gaps will be installed incrementally based upon the annual budget allocation for the sidewalk program and the priority system.

 

DISCUSSION:

In preparation for the 2018 Annual New Sidewalk Program, City staff comprehensively evaluated the sidewalk gap inventory based on the priority system.  The priority system phases installation of sidewalk based on public safety, proximity to schools, linkages to the existing pedestrian network, roadway classification, project coordination opportunities, and public input.  An overview of the priority system used to determine the sidewalk gaps recommended for installation is attached. 

 

The City has received commitments from both DuPage County and Wheatland Township for participation in a cost-share for the 2018 new sidewalk locations proposed along those agency’s roadways.

 

Transportation Advisory Board

On the July 6, 2017 TAB meeting, staff presented a list of top locations for near-term (within three years) installation, as determined by the priority system. The near-term location list and TAB meeting minutes are attached. The purpose of this initial TAB meeting was to receive public input in order to select the top candidates for installation in 2018 from the larger three-year pool.

 

Residents and property owners on the blocks where new sidewalk is proposed in the near-term were invited to provide public input. This invitation was extended to all property owners along the side of the roadway segment where sidewalk construction is proposed, whether their residence currently has sidewalk or not. Notice was also posted on the City’s website.

 

Based on the priority system of the Comprehensive Sidewalk Policy and incorporating the public input received, the following 2018 Annual New Sidewalk Program recommendation was developed.  Maps of the sidewalk gap locations are attached.

 

No.

Street Name

Side

Gap Segment

Location

1.

Book Road

East

Douglas Rd to Leverenz Rd

Arterial

2.

Chicago Av

North

Julian St to 300’ East of Huffman St

Arterial

 

Julian St

East

56 S Julian St

Other Non-Arterial

3.

Douglas Av

South

Webster St to Washington St

Other Non-Arterial

4.

Eagle St

East

Franklin Av to Douglas Av

Lairds Woods

5.

Jefferson Av

South

Birchwood Av to Whispering Hills Dr

Other Non-Arterial

6.

Knoch Knolls Rd

North

Mayfield Ct to Seiler Dr

Other Non-Arterial

7.

Loomis St

East

Porter Av to Prairie Av

East Highlands

8.

Willow Rd

West

Hillside Rd to Maple Ln

East Highlands

 

On September 7, 2017, TAB considered the 2018 Annual New Sidewalk Program. All property owners along the eight proposed gap segments were invited and notice was again posted on the City’s website. Three members of the public provided testimony; see the attached draft meeting minutes. At the conclusion of the discussion, TAB recommended approval of the 2018 Annual New Sidewalk Program, (Approved, 8-1).

 

On November 7, 2017, the 2018 Annual New Sidewalk Program was presented to City Council for approval. Due to funding, Council directed staff to reduce the location list and to provide Council with alternatives encompassing priority locations. Based on criteria such as school walk routes, unincorporated properties, and pedestrian safety, as well as Council input, staff recommends that City Council approve the 2018 Annual New Sidewalk Program consisting of Chicago Avenue/Julian Street, Eagle Street, Loomis Street, Willow Road, and Book Road for a City cost of $155,000. As an alternative, a 2018 Annual New Sidewalk Program consisting of Chicago Avenue/Julian Street, Eagle Street, and Loomis Street would cost the City $75,000.

 

Location

Option 1 - $155,000

Option 2 - $75,000

City Cost

Agency Cost

Total Cost

Chicago Av/Julian St

X

X

 $ 41,575

 $ 6,200

 $ 47,775

Eagle St

X

X

 $ 11,050

 

 $ 11,050

Loomis St

X

X

 $ 21,125

 

 $ 21,125

Willow Rd

X

 

 $ 33,800

 

 $ 33,800

Book Road

X

 

 $ 47,288

 $ 47,288

 $ 94,576

Knoch Knolls Rd

 

 

 $ 26,000

 $ 13,000

 $ 39,000

Douglas Av

 

 

 $ 46,150

 

 $ 46,150

Jefferson Av

 

 

 $ 60,450

 

 $ 60,450

 

FISCAL IMPACT:                     

The amount proposed for CY18 will be adjusted to reflect the option selected by City Council.