CITY COUNCIL AGENDA ITEM

ACTION REQUESTED:
title
Approve the award of Option Year #1 to Contract 25-032, Storm Sewer Rehabilitation, to Performance Pipelining, Inc. for an amount not to exceed $750,000 plus a 3% contingency
body

DEPARTMENT: Department of Public Works

SUBMITTED BY: Dan Randolph, P.E., Director

BOARD/COMMISSION REVIEW:
N/A

BACKGROUND:
The Department of Public Works (DPW) maintains the City's system of storm sewers. Storm sewers have a functional lifespan of approximately 75 years. As storm sewer ages, the pipes develop cracks caused by material degradation, soil settlement, root intrusion, and/or adjacent construction. When a segment of storm sewer approaches the end of its useful life, the extent and severity of pipe degradation result in a high probability for pipe/system failure. Pipe failure may cause sinkholes in roadway surfaces and may also result in flooding of homes, businesses, and/or public rights-of-way. The City has relined approximately 265,000 linear feet of pipe since the inception of the Storm Sewer Lining Program (SW017) in 2004, which has led to a reduction in localized flooding and related complaints.

The City Council awarded Bid 25-032, Storm Sewer Rehabilitation, to Performance Pipelining, Inc on April 15, 2025, for a seven-month term through October 15, 2025, with two, one-year options to extend. The purpose of the contract is the rehabilitation of storm sewers by the installation of a cured-in-place pipe (CIPP). The contract includes a pre-inspection and cleaning of all pipes, the installation of CIPP, and the inspection of each completed installation by closed circuit television.

DISCUSSION:
During the first option year of the contract, Performance Pipelining, Inc completed the rehabilitation of approximately 9,200 feet of storm sewer ranging from eight inches to 30 inches in diameter by the installation of CIPP as well as the cleaning and televising of the storm sewer. In 2025, work was completed in The Fields ...