CITY COUNCIL AGENDA ITEM
ACTION REQUESTED:
title
Approve the award of RFQ 22-114 Work Order #4, Engineering Services for Central Elevated Water Tank Relocation, to Baxter & Woodman, Inc. for an amount not to exceed $192,670, plus a 5% contingency
body
DEPARTMENT: Water Utilities
SUBMITTED BY: Darrell Blenniss, Director
BOARD/COMMISSION REVIEW:
N/A
BACKGROUND:
In 2022, the Water Utilities completed a Request for Qualifications (RFQ 22-114) , Engineering Services for Water Supply and Sanitary Lift Stations. The following four consultants were shortlisted for a three-year term as a result of this process:
1. Baxter & Woodman, Inc.
2. CDM Smith, Inc.
3. Ciorba Group, Inc.
4. Fehr Graham, Inc.
The Central Elevated Water Tank (CET) was originally built in 1937 and is located at 418 E 5th Avenue. According to the Water Tank Inspection Report prepared by Dixon Engineering, Inc., it requires significant repairs to continue operation. The total repair costs will be over $1 million. Additionally, its current location creates difficulties for future site development
City staff has conducted a concept study for water tank relocation and recommends relocating the water tank to the southeast corner of the existing site and demolishing the CET.
In February 2023, the Water Utilities issued RFQ 22-114 Work Order #4 for Engineering Services for Water Supply and Sanitary Lift Stations to select one of the shortlisted consultants for this project. The project involves design engineering, permitting, bid phase services, and construction assistance to demolish the existing CET, build a new elevated water tower, and conduct associated utilities and civil work.
DISCUSSION:
Advertisement Date: February 13, 2023 Notices Sent: 4
Opening Date: April 7, 2023 Planholders: 4
Proposals Received: 3
CDM Smith decided not to submit a proposal and three proposals were received, they are summarized as below:
Firm Name
Proposal ...
Click here for full text