CITY COUNCIL AGENDA ITEM
ACTION REQUESTED:
title
Approve the award of Bid 23-250, Northeast Waterworks Standpipe Rehabilitation Project, to ERA-Valdivia Contractors, Inc. for an amount not to exceed $1,632,075, plus a 3% contingency
body
DEPARTMENT: Water Utilities
SUBMITTED BY: Darrell Blenniss, Director of Water Utilities
BOARD/COMMISSION REVIEW:
N/A
BACKGROUND:
In 1968, the two-million-gallon standpipe at the Northeast Waterworks (NEWW) was constructed. In 2016, the standpipe exterior was spot treated and overcoated. In 2004, the interior was spot coated. These coatings have exceeded their life expectancy and surfaces now need to be cleaned to bare metal and recoated.
On August 24, 2023, KLM Engineering, Inc. (KLM), an independent third-party engineering firm, inspected the NEWW standpipe. The inspection revealed deterioration of the interior and exterior surface coatings with numerous failures exposing the structure to corrosion and rust. Safety and structural repairs were also identified and recommended for completion while the standpipe is out of service for painting.
Based on KLM's inspection and a consultation with Sherwin-Williams Company, staff determined that the painting and repairs be completed to preserve the integrity of this critical asset. KLM recommends the following:
1. Exterior surface to be abrasive blast cleaned to SSPC-SP 10 condition and primed and coated with a zinc epoxy urethane coating system.
2. Logos to be applied over the new exterior surface coating with a urethane coating system.
3. Exterior standpipe wall within PAS 15D to be abrasive blast cleaned to SSPC-SP 10 condition and primed and coated with a zinc insulative coating system.
4. Dry interior/access pallister surface to be abrasive blast cleaned to SSPC-SP 10 condition and primed and coated with a zinc epoxy coating system.
5. Wet interior surfaces to be abrasive blast cleaned to SSPC-SP 10 condition and primed and coated with a zinc epoxy coating system.
...