File #: 21-0549    Version: 1
Type: BID, RFP, RFQ, COOP, SOLE SOURCE, OPTION YEAR Status: Agenda Ready
File created: 4/21/2021 In control: City Manager Procurement Awards
On agenda: 6/1/2021 Final action:
Title: Approve the award of RFQ 21-163, Springbrook Water Reclamation Center Structural Engineering, to Deuchler Engineering Corporation for an amount not to exceed $29,044 for a seven-month term
Attachments: 1. WW041
Related files: 18-455, 22-0078, 21-1037
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
CITY MANAGER AUTHORITY PROCUREMENT AWARDS

ACTION REQUESTED:
title
Approve the award of RFQ 21-163, Springbrook Water Reclamation Center Structural Engineering, to Deuchler Engineering Corporation for an amount not to exceed $29,044 for a seven-month term
body

DEPARTMENT: Water Utilities

SUBMITTED BY: Darrell Blenniss, Director

BACKGROUND:
In March 2018, the Water Utilities completed a Request for Qualifications (RFQ-18-064) for engineering services for water and wastewater projects for a three-year term from July 30, 2018 through July 29, 2021 with four, one-year options to extend. Five consultants were shortlisted due to the process. The consultants are:

Crawford Murphy & Tilly, Inc.
Walter E. Deuchler Associates, Inc.
Donohue & Associates, Inc.
Lockwood Andrews & Newnam, Inc.
Strand Associates, Inc.

In March 2021, the Water Utilities issued RFQ 21-163 to hire a consulting firm to provide technical assistance and experience with five structural engineering tasks at Springbrook Water Reclamation Center. The work includes the following tasks:

* Evaluate conveyor supports in the biosolids holding building
* Evaluate significant settlement issue on the east end sidewalk in the center of the aeration tanks. Research and investigate alternatives to restore water tightness and prevent additional settlement.
* Evaluate the west perimeter of the aeration tank walkway expansion joint through the influent channel to determine cause of leakage.
* Evaluate the northwest knockout panel and develop a detail and specification to make a permanent repair of this area.
* Evaluate the northeast knockout panel, pilaster and adjacent wall, which depreciated and cracked.

For each task, the consultant will perform a field investigation, develop a preliminary report and prepare an engineer's opinion of probable construction cost and a final report that includes design details, drawings and specifications suitable for inclusion in a construction bid contract package, signed a...

Click here for full text