File #: 22-1295    Version: 1
Type: BID, RFP, RFQ, COOP, SOLE SOURCE, OPTION YEAR Status: Agenda Ready
File created: 10/25/2022 In control: City Council
On agenda: 12/6/2022 Final action:
Title: Approve the award of Sole Source Procurement 22-329, Naper Boulevard Stormwater Lift Station Upgrade of Vaughan Model S8N-151 Submersible Chopper Pump, to Gasvoda & Associates, Inc., for an amount not to exceed $249,989.00
Attachments: 1. Naperville - Naper Blvd (Vaughan Offering) Final Design Package 11-10-22
CITY COUNCIL AGENDA ITEM

ACTION REQUESTED:
title
Approve the award of Sole Source Procurement 22-329, Naper Boulevard Stormwater Lift Station Upgrade of Vaughan Model S8N-151 Submersible Chopper Pump, to Gasvoda & Associates, Inc., for an amount not to exceed $249,989.00
body

DEPARTMENT: Water Utilities

SUBMITTED BY: Darrell Blenniss, Director

BACKGROUND:
The Naper Boulevard Stormwater Lift Station was installed in 1985 to prevent Naper Boulevard at the Burlington-Northern Railroad Underpass from flooding during rain events.

The Naper Boulevard Stormwater Lift Station is a critical assest that requires major rehabilitation due to the age and deterioration of most equipment at the station. Currently, pumps cannot be pulled due to deteriorated guide rails, check valves and isolation valves are no longer in service, and many safety upgrades are needed for this station. Rehabilitation of this station will include, new pumps, piping and valves, safety devices, lighting ventilation, hatches, handrails, electrical devices and conduits and additional controls.

City staff evaluated equipment from various pump manufacturers for project feasibility based on the lead time, efficiency, discharging flow rates, serviceability cost, constructability, and compatible pump and system curves. As a result of the evaluation, City staff recommended the use of Vaughan pumps.

DISCUSSION:
This sole source is requested for a one-time purchase of three Vaughan pumps. Because the lead time for the pumps is approximately 28-32 weeks, staff recommends purchasing the pumps in advance of hiring a contractor to perform the rehabilitation work, so the pump lead time does not delay the contractor. It is anticipated that the Naper Boulevard Stormwater Lift station rehabilitation construction bid will be advertised during early spring, 2023.

The Water Utilities identified this purchase as a sole source because Gasvoda & Associates, Inc. is the only distributor that can quota Vaughan pr...