File #: 25-0711    Version: 1
Type: Procurement Change Order Status: Agenda Ready
File created: 5/20/2025 In control: City Council
On agenda: 6/3/2025 Final action:
Title: Approve the award of Change Order #1 to Work Order 22-067-0.I.00-WU, Odyssey West Water Main Rehabilitation - Design Engineering, to Crawford, Murphy & Tilly, Inc. for an amount not to exceed $13,740, a total award of $73,540, and an additional 912 calendar days
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
CITY COUNCIL AGENDA ITEM

ACTION REQUESTED:
title
Approve the award of Change Order #1 to Work Order 22-067-0.I.00-WU, Odyssey West Water Main Rehabilitation - Design Engineering, to Crawford, Murphy & Tilly, Inc. for an amount not to exceed $13,740, a total award of $73,540, and an additional 912 calendar days
body

DEPARTMENT: Water Utilities

SUBMITTED BY: Darrell Blenniss, Director of Water Utilities

BOARD/COMMISSION REVIEW:
N/A

BACKGROUND:
The City Manager awarded Work Order 22-067-0.I.00-WU to CMT on March 4, 2024, with a completion date of July 2, 2024.

The scope of work for Work Order 22-067-0.I.00-WU was for CMT to manage agency permitting and prepare construction documents for a water main rehabilitation at the northwest quadrant of Interstate 88 and IL Route 59. Rehabilitation would include the installation of a cured-in-place pipe liner inside an existing ductile iron pipe that is located in a regulated wetland area.

DISCUSSION:
This Change Order is requested to compensate for additional costs necessary to satisfactorily complete the engineering design and to extend the completion date from July 2, 2024, to December 31, 2026.

Due to budget considerations and the extent of permitting, the scope of work was revised and re-budgeted as WU425 Odyssey West Water Main Improvements. This change in scope required additional wetland delineation to be performed by CMT. Additionally, DuPage County determined that a tabular permit submittal would be required for this work, something that was not anticipated or deemed necessary at the start of design.

The additional effort for these tasks, along with the revised schedule, required a significant extension of the original completion date.

Staff recommends approval of this Change Order to ensure that the engineering design can be completed as required.

FISCAL IMPACT:
CIP#: WU425 - Odyssey West Water Main Improvements

The requested award is expensed to the account number listed below. The 2025 budge...