File #: 23-0102    Version: 1
Type: BID, RFP, RFQ, COOP, SOLE SOURCE, OPTION YEAR Status: Passed
File created: 1/24/2023 In control: City Council
On agenda: 2/7/2023 Final action: 2/7/2023
Title: Approve the award of Bid 23-018, Main Street and Washington Street Water Main and Roadway Improvements, to A Lamp Concrete Contractor, Inc., for an amount not to exceed $2,458,000
Attachments: 1. WU401, 2. MP009
CITY COUNCIL AGENDA ITEM

ACTION REQUESTED:
title
Approve the award of Bid 23-018, Main Street and Washington Street Water Main and Roadway Improvements, to A Lamp Concrete Contractor, Inc., for an amount not to exceed $2,458,000
body

DEPARTMENT: Water Utilities

SUBMITTED BY: Darrell Blenniss, Director

BOARD/COMMISSION REVIEW:
N/A

BACKGROUND:
In January 2023, Water Utilities issued Bid 23-018, Main Street and Washington Street Water Main and Roadway Improvements. The project includes water main replacement and roadway resurfacing on Main Street between Hillside Road and Aurora Avenue. The project also includes the abandonment of a redundant water main on Washington Street between Hillside Road and Aurora Avenue.

The purpose of the project is to replace aging and deficient water main. The existing 6" water main on Main Street is cast iron pipe and was installed in the 1960's. It will be replaced and upsized to 8" ductile iron pipe in accordance with City standards.

The work on Washington Street involves the transfer of water services from a 6" water main installed in the 1960's to a 12" water main installed in the 2000's. After the services are transferred, the 6" main will be taken out of service.

Upon completion of the water main installation, Main Street will be milled and resurfaced. This work also includes upgrades to sidewalk ramps to ADA standards and replacement of deficient curb and gutter.

DISCUSSION:

Advertisement Date:
1/3/2023
Notices Sent:
344
Opening Date:
1/18/2023
Planholders:
36


Proposals Received:|1010|
Bids were received from the following vendors:
Vendor Name
Proposed Cost
Engineer's Estimate
$2,640,748.50
A Lamp Concrete Contractors, Inc.
$2,458,000.00
Bolder Contractors
$2,684,989.00
Swallow Construction
$3,134,128.50

A Lamp Concrete Contractors submitted the low bid for the project at $2,458,000. The bid is 6.9% lower than the engineer's estimate; however, it is 31% higher than the amount included in the 2023 budget....

Click here for full text