File #: 26-0306    Version: 1
Type: Procurement Award Status: Passed
File created: 3/2/2026 In control: City Council
On agenda: 3/18/2026 Final action: 3/18/2026
Title: Approve the award of Bid 25-313, 2026 Southeast Waterworks Drainage Pump Replacement, to Performance Construction & Engineering LLC for an amount not to exceed $516,632 plus a 3% contingency
CITY COUNCIL AGENDA ITEM

ACTION REQUESTED:
title
Approve the award of Bid 25-313, 2026 Southeast Waterworks Drainage Pump Replacement, to Performance Construction & Engineering LLC for an amount not to exceed $516,632 plus a 3% contingency
body

DEPARTMENT: Water Utilities

SUBMITTED BY: Darrell Blenniss, Director

BOARD/COMMISSION REVIEW:
N/A

BACKGROUND:
The Southeast Waterworks reservoir underdrain sump pumps are used to collect foundation drainage from the underdrain system surrounding the reservoir.

The system consists of two 3-horsepower sump pumps that were originally installed in 2008. The pumps have now reached the end of their service life and need to be replaced. In addition, both drainage pumps are controlled by a single disconnect and cannot be monitored or remotely controlled through SCADA. These issues need to be addressed as part of this project.

Therefore, the proposed project includes replacement of the two existing drainage pumps, installation of vented junction boxes, a new programmable logic controller (PLC), new discharge piping, and associated wiring and conduits.

DISCUSSION:
Advertise Date: 01/28/2026 Notices Sent: 2801
Bid Opening: 2/25/2026 Planholders: 24
Proposals Received:|910|
Completed bids were received from the following vendors:

Vendors Name
Proposed Cost
Performance Construction & Engineering LLC
$516,632.00
Airy's, Inc.
$549,617.00
Engineer's estimate
$552,000.00

Performance Construction & Engineering LLC has extensive experience in lift station rehabilitation and has successfully completed similar projects for the City. Staff recommends awarding the project to Performance Construction & Engineering LLC as the lowest responsive and responsible bidder for the procurement of construction services, as defined by Section 1-9B-7 of the Procurement Code (RBO-qualified).

The completion date of this project is March 30, 2027.

FISCAL IMPACT:
CIP#: WU072 - Water Facility Under Drain System Rehabilitation...