CITY COUNCIL AGENDA ITEM
ACTION REQUESTED:
title
Approve the award of Bid 24-014, Small Diameter Sanitary Sewer Main Lining Program - 2024, to Hoerr Construction, for an amount not to exceed $619,182 and a 3% contingency
body
DEPARTMENT: Water Utilities
SUBMITTED BY: Darrell Blenniss, Director
BOARD/COMMISSION REVIEW:
N/A
BACKGROUND:
The Water Utilities 2024 Capital Improvement Plan (CIP) includes rehabilitation of approximately 50 manholes, 13,985 linear feet of sanitary main/trunk sewers, and 235 sewer service laterals. The primary focus of these projects is to reduce leakage of groundwater and surface water into the system. The sanitary sewer main lining program is part of the Water Utilities' Illinois Environmental Protection Agency (IEPA) required capacity, management, operation, and maintenance (CMOM) plan and ten-year infiltration and inflow reduction program. These requirements are under Naperville's National Pollutant Discharge Elimination System permit IL0034061.
Sanitary sewer lining is a major component of the City's strategy to reduce system leaks associated with stormwater infiltration through pipe cracks and fissures, which reduces sanitary system capacity during wet weather events. Lining the sewer provides seamless, leak-free pipes and maintains structural integrity for approximately 50 years. Reducing leaks and preserving system capacity also help reduce the number and severity of sanitary sewer backups.
DISCUSSION:
In December 2023, the Water Utilities issued Bid 24-014, 2024 Small Diameter Sanitary Sewer Main Lining. This bid will rehabilitate 13,985 linear feet of eight-inch through fifteen-inch diameter sanitary sewer pipeline located in Naperville Center of Commerce & Industrial Park located North Aurora Road and Diehl Road. The contractor will use no-dig lining technology to reduce costs and disruption to the community.
To secure the lowest possible pricing, the bid specified two competing lining technologies: glass-reinforced plastic (GRP) and cured-in-place thermosetting resin pipe (CIPP).
Advertisement Date: 12/15/2023 |
|
Notices Sent: 614 |
|
Opening Date: 1/9/2024 |
|
Planholders: 20 |
|
|
|
Proposals Received: 5 |
|
Vendor |
Bid Amount |
Hoerr Construction |
$619,182.00 |
Engineer Estimate |
$635,500.00 |
Performance Pipeline |
$664,902.00 |
Visu-Sewer Clean and Seal |
$703,733.65 |
National Power Rodding Corporation |
$706,772.75 |
Insituform Technologies USA, LLC. |
$742,679.77 |
Hoerr Construction is the lowest responsive and responsible bidder. The Water Utility has worked with this contractor in the past and the work was satisfactory. The completion date of this project is December 31, 2024.
FISCAL IMPACT:
CIP#: WW058
Rehabilitation of the small diameter sanitary sewer main in the Naperville center of commerce and industrial park, is budgeted in the account number listed below as part of the Water Capital Program. A total of $679,800 is approved for this project as part of the 2024 CIP. The requested award including the contingency amounts are within the budget.
Account |
Fund Description |
Total Account Budget |
41252000-551502 |
Water Capital Fund |
$40,264,902 |
Per Council directive, contingency on construction projects is set at 3% on projects over $500,000 and 5% on projects under $500,000.