File #: 25-1701    Version: 1
Type: Procurement Award Status: Agenda Ready
File created: 12/22/2025 In control: City Council
On agenda: 1/20/2026 Final action:
Title: Approve the award of Bid 25-244, Northwest Waterworks Improvements - Phase III, to Dahme Mechanical Industries, Inc. for an amount not to exceed $2,047,597, plus a 3% contingency, and for a 14-month term
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

CITY COUNCIL AGENDA ITEM

 

ACTION REQUESTED:
title

Approve the award of Bid 25-244, Northwest Waterworks Improvements - Phase III, to Dahme Mechanical Industries, Inc. for an amount not to exceed $2,047,597, plus a 3% contingency, and for a 14-month term

body

 

DEPARTMENT:                     Water Utilities

 

SUBMITTED BY:                     Darrell Blenniss, Director

 

BOARD/COMMISSION REVIEW:
N/A

 

BACKGROUND:

The Northwest Water Works includes five booster pumps that were installed in 1997 and have reached the end of their service life. Rehabilitation of the Northwest Water Works began in 2020. During Phase I, two variable frequency drives (VFDs) were installed for the two 350-hp pumps. During Phase II, an additional three VFDs were installed for the two 150-hp pumps and the one 125-hp pump. In addition, the aging pipes and valves were replaced. The lighting was upgraded to LED fixtures, and the SCADA system was upgraded to accommodate the new VFDs.  

 

In November 2025, the Water Utilities issued Bid 25-244, Northwest Water Works Improvements - Phase III, which includes replacement of the five booster pumps, replacement of aging pipes and valves, installation of a pump vacuum priming system, replacement of two chlorine booster pumps, installation of VFDs for the chlorine booster pumps, and associated SCADA improvements. The work also includes installation of associated electrical conduits and wiring.

 

DISCUSSION:

 

Advertisement Date:

11/05/2025

Notices Sent:

1089

Opening Date:

12/19/2025

Planholders:

23

 

 

Proposals Received:

2

 

Bids were received from the following vendors:

 

Vendors Name

Proposed Cost

Dahme Mechanical Industries

$2,047,597.00

Independent Mechanical

$2,275,000.00

Engineer’s Estimate

$2,515,000.00

 

Dahme Mechanical Industries has completed several successful projects for the City in the past, including Phase I of Northwest Waterworks improvements.  Dahme Mechanical Industries, Inc. is currently working on Phase II of this project.

 

Staff recommends award of the contract to Dahme Mechanical Industries, Inc., as the lowest responsive and responsible bidder for the procurement of construction services, as defined by Section 1-9B-7 of the Procurement Code (RBO-qualified).

 

The term of the contract is from the date of award through final completion date of March 30, 2027.

 

FISCAL IMPACT:

CIP #: WU051 - Northwest Waterworks Improvements-Phase III

 

Costs related to Phase III of the Northwest Water Works Improvement Project are expensed to the Infrastructure account listed below. The 2026 Budget includes $1,850,000 for the project, with another $1,500,000 planned for 2027.  The allocated funds for 2026 are sufficient, and the department will ensure 2027 funds are budgeted appropriately.  

 

Account Number

Fund Description

Total Budget Amount

41251500-551502

Water Utilities Fund

$86,910,285

 

*Per Council directive, contingency on construction projects is set at 3% on projects over $500,000 and 5% on projects under $500,000.