File #: 23-0009    Version: 1
Type: BID, RFP, RFQ, COOP, SOLE SOURCE, OPTION YEAR Status: Agenda Ready
File created: 1/3/2023 In control: City Manager Procurement Awards
On agenda: 2/1/2023 Final action:
Title: Approve the award of JOC Procurement DPW.013.CY22.A, Electrical and Low Voltage Install for Police Department Gate, to Robe Inc. for an amount not to exceed $43,391.76
Related files: 22-0976
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

CITY MANAGER AUTHORITY PROCUREMENT AWARDS

 

ACTION REQUESTED:
title

Approve the award of JOC Procurement DPW.013.CY22.A, Electrical and Low Voltage Install for Police Department Gate, to Robe Inc. for an amount not to exceed $43,391.76

body

 

DEPARTMENT:                     Department of Public Works

 

SUBMITTED BY:                     Richard Dublinski, Director

 

BACKGROUND:

In August 2022, the Police Department (Police) and Department of Public Works - Public Buildings Operation division (DPW-PBO) issued Bid 22-229 for the installation of a security fence and gates around the perimeter of the building and replacement of windows to enhance campus safety.

 

The work includes the demolition of the existing iron fence and swing gate on the Police campus and installation of new eight-foot high, heavy duty security fencing, two high-security automatic sliding fence gates, a high-security swing gate and restoration of all turf disturbed during the demolition and installation process. Also included in this bid is the demolition and removal and replacement of eight windows in the Records Division, located on the north side of the building with new high-security window frames and glazing.

 

DISCUSSION:

During the installation of a new gate with the security fence project, the contractor discovered the conduit run housing the main power and low voltage communication lines from the Police Department’s 911 center to the current gate arm, badge access control and animal control facility was compromised as a result of ground settling and corrosion.  The conduit run must be replaced. 

 

DPW-PBO recommends the JOC contractor complete the necessary work due to concerns of power failures and to maintain the security project schedule.  This work will incorporate new conduit runs, buried electrical boxes, wiring and tracer wire for locating in the future and will provide a hard-wired communication.

 

FISCAL IMPACT:

CIP #: MB219 - NPD Building Renovations

 

Phase I of the Police Department building renovation project is expensed to the Building Improvements account below. The project is budgeted as a part of capital improvement project MB219, NPD Building Renovations, for which $481,000 is budgeted in 2023. The requested award is withing the budgeted amount for this expense.

 

Account Number

Fund Description

Total Budget Amount

 21102200-551500

 Capital Projects Fund

$481,000