Legislation Details

File #: 21-1037    Version: 1
Type: Procurement Award Status: Agenda Ready
File created: 8/4/2021 In control: City Manager Procurement Awards
On agenda: 9/1/2021 Final action:
Title: Approve the award of Change Order 1 to Contract 21-163, Springbrook Water Reclamation Center Structural Engineering, to Deuchler Engineering Corporation for an amount not to exceed $13,150 and for a total award of $42,194
Attachments: 1. WW041
Related files: 21-0549
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

CITY MANAGER AUTHORITY PROCUREMENT AWARDS

 

ACTION REQUESTED:
title

Approve the award of Change Order 1 to Contract 21-163, Springbrook Water Reclamation Center Structural Engineering, to Deuchler Engineering Corporation for an amount not to exceed $13,150 and for a total award of $42,194

body

 

DEPARTMENT:                     Water Utilities

 

SUBMITTED BY:                     Darrell Blenniss, Director

 

BACKGROUND:

In April 2021, the City Manager awarded Contract 21-163 to Deuchler Engineering Corporation for the structural evaluation and engineering design of five structural engineering tasks at Springbrook Water Reclamation Center. The engineering tasks include evaluation of a conveyor in the biosolids holding building, knock out panels in the aeration tanks, settlement of the aeration tank walkway and leakage around the influent channel, as well as preparation of a preliminary report, engineer’s opinion of probable construction cost and a final report including design details, drawings and specifications suitable for inclusion in a construction bid contract package.

 

The value of the original contract was $29,044.

 

DISCUSSION:

The consultant performed well on the structural evaluation and engineering design work. Due to existing heavy workload of the city’s engineering staff, staff solicited a price for construction services from the consultant. The construction services tasks include:

 

•                     Additional meetings, including a pre-bid conference, pre-construction meeting, construction progress meetings as requested

•                     Time spent preparing addenda and revisions to plans and specifications

•                     Shop drawing reviews of all submittals, including structural steel, concrete mix design and polyurethane injection grout

•                     Field visits as requested and including punchlist and final inspection

•                     Responding to RFIs during construction.

 

For the items outlined above, staff recommends approval of Change Order 1 in an amount not to exceed $13,150.

 

FISCAL IMPACT:

CIP: WW041

 

Consultant services for structural repair projects at Springbrook Water Reclamation Facility are expensed to the infrastructure account listed below, as part of the capital improvement program. A total of $415,950 is budgeted for WW041 in 2021. The requested award is within budget.

 

Account Number

Fund Description

Total Budget Amount

41251500-551502

Water & Wastewater Fund

$26,743,950