File #: 23-0374    Version: 1
Type: BID, RFP, RFQ, COOP, SOLE SOURCE, OPTION YEAR Status: Passed
File created: 3/23/2023 In control: City Council
On agenda: 4/5/2023 Final action: 4/5/2023
Title: Approve the award of Bid 23-016, 2023 Sanitary Sewer Service Lateral Lining and Vac-A-Tee Installation, to Performance Pipelining, Inc. for an amount not to exceed $1,949,995 plus a 3% contingency
Related files: 23-1138

CITY COUNCIL AGENDA ITEM

 

ACTION REQUESTED:
title

Approve the award of Bid 23-016, 2023 Sanitary Sewer Service Lateral Lining and Vac-A-Tee Installation, to Performance Pipelining, Inc. for an amount not to exceed $1,949,995 plus a 3% contingency

body

 

DEPARTMENT:                     Water Utilities

 

SUBMITTED BY:                     Darrell Blenniss, Director

 

BOARD/COMMISSION REVIEW:
N/A

 

BACKGROUND:

In February 2023, the City issued Bid 23-016 for rehabilitation of approximately 169 existing sanitary sewer service laterals by utilizing the installation of cured-in-place pipe (CIPP). The bid also includes the installation of approximately 200 Vac-A-Tee cleanouts. All Vac-A-Tee cleanouts will be installed in Brookdale Subdivision to facilitate sewer lateral line grouting, which will reduce groundwater infiltration.

 

Lining and/or grouting service laterals has shown to be effective in reducing groundwater and rainfall related infiltration and inflow into the sanitary sewer system. Excessive infiltration and inflow into the sanitary sewer system take up system conveyance capacity which may cause sanitary sewer overflows and sanitary sewer basement backups.

 

The Sanitary Sewer Service Lateral Lining and Vac-A-Tee program is part of the City’s IEPA required ten-year wastewater collection rehabilitation plan, as well as the IEPA required ten-year infiltration and inflow reduction plan to reduce wastewater backups during heavy rain events.

 

DISCUSSION:

Advertisement Date: 02/28/2023                                 

Opening Date: 03/16/2023                                                                                                                                     Notices Sent: 202

Plan holders: 15

Proposals Received: 2

 

BID TABULATION:

The following bids were received.

 

Vendor Name

Proposed Cost

Engineer’s Estimate

$1,920,560

Performance Pipelining

$1,949,995

Hoerr Construction

$2,194,300

 

The term of the contract is from the date of award through December 31, 2023, with four one-year options to extend. The city has worked with this contractor in the past and the work has been satisfactory.

 

 

FISCAL IMPACT:

CIP: WW052

 

Sanitary sewer service lateral lining and vac-a-tee installation are budgeted as part of the Water Capital program. The requested award including the contingency request exceeds the budget for this project by $408,495 however, the overage can be accommodated within the overall Water Capital program for 2023. Staff will continue to monitor expenses to ensure compliance with budgetary guidelines.

 

Account Number

Fund Description

Project Budget

Total Fund Budget

41252000-551502

Water Capital Fund

$1,600,000

39,813,900

 

 

Per Council directive, contingency on construction projects is set at 3% on projects over $500,000 and 5% on projects under $500,000.