Approve the award of Bid 23-255, Flow Meter Maintenance, Flow Data Analysis, and SSO Alarming Service to ADS Environmental Services, for the amount not to exceed $889,200.00 for a three-year term with two, three-year options to extend.

body

 

DEPARTMENT:                     Water Utilities

 

SUBMITTED BY:                     Darrell Blenniss, Director

 

BOARD/COMMISSION REVIEW:
N/A

 

BACKGROUND:

The Water Utility operates and maintains a large network of 35 wastewater flow monitors, 13 Rain Gauges, 18 Sanitary Sewer Overflow Alarms and 2 River Level Monitoring Gauges. These devices are used for the purpose of developing Operation and Maintenance (O&M) and Capital Improvement programs for the wastewater collection system, billing of wastewater flows from the City of Warrenville and wet weather planning to prevent wastewater backups and discharges.  Also, these devices are the critical tool used in the Water Utilities “Infiltration and Inflow Reduction Program” required by the IEPA.

 

On November 30, 2023, The Water Utility issued Bid 23-255. This bid will provide flow monitor maintenance services, data hosting services and analytical reporting services for these devices that are deployed throughout Naperville’s sanitary sewer system. The data from these flow monitors is used to identify areas where Rainfall Derived Infiltration and Inflow (RDII) is most prevalent. This information will be used in planning future sanitary sewer rehabilitation efforts that will provide the greatest possible benefits in eliminating rainfall-related sanitary sewer overflows. This contract also provides for installation of ten additional flow monitors to be used for early detection and mobilization of City staff to mitigate the effects of sanitary sewer high flows.

 

DISCUSSION:

Advertisement Date: 11/30/23

Bid Opening Date: 12/21/23

Notices Sent: 174

Plan Holders: 10

Proposals Received: 2

 

Bids were received from the following vendors.

 

Vendors Name

Proposal Cost

ADS Environmental Services

$889,200.00

Engineer’s Estimate

$995,500.00

RJN Group, Inc.

$1,178,580.00

 

Staff recommends awarding ADS Environmental Services being the lowest responsive bidder.

 

The term of this contract is three-years from date of award through December 31, 2026 with two, 3-year options to extend.

 

FISCAL IMPACT:

 

Flow meter maintenance, analysis and SSO alarm services are budgeted and expensed to the account number listed below. A total of $450,000 is approved for these services as part of the 2024 budget. The requested award for Year 1 is within the budget. Amounts for subsequent years will be budgeted accordingly during each budget cycle.

 

Account Number

Fund Description

Total Budget Amount

41251520-531308

Water Utility Fund