CITY COUNCIL AGENDA ITEM
ACTION REQUESTED:
title
Approve the award of Bid 20-032, 2020 Sanitary Sewer Service Lateral Lining and Vac-A-Tee Installation, to Performance Pipelining, Inc. for an amount not to exceed $1,249,980 plus a 3% contingency
body
DEPARTMENT: Water Utilities
SUBMITTED BY: Darrell Blenniss, Director
BOARD/COMMISSION REVIEW:
N/A
BACKGROUND:
In February 2020, the Water Utilities issued Bid 20-032 for rehabilitation of approximately 214 existing sanitary sewer service laterals by utilizing installation of cured-in-place pipe (CIPP). The bid also includes installation of approximately 411 Vac-A-Tee cleanouts. One hundred of the Vac-A-Tee cleanouts will be installed in Cress Creek to facilitate sewer lateral line grouting, which will reduce groundwater infiltration.
Lining and/or grouting service laterals has shown to be effective in reducing groundwater and rainfall related infiltration and inflow into the sanitary sewer system. Excessive infiltration and inflow into the sanitary sewer system take up system conveyance capacity which may cause sanitary sewer overflows and sanitary sewer basement backups.
DISCUSSION:
Advertisement Date: 02/19/2020 Notices Sent: 85
Opening Date: 03/09/2020 Planholders: 10
Proposals Received: 2
BID TABULATION
The following bids were received:
Vendor Name |
Proposed Cost |
Performance Pipelining |
$1,249,980 |
Engineer’s Estimate |
$1,292,990 |
Musson Bros. Inc. |
$1,491,900 |
The term of the contract is from date of award through December 31, 2020, with two one-year options to extend. The City has worked with this contractor in the past and the work has been satisfactory.
FISCAL IMPACT:
CIP: WW006
Lateral lining is expensed to the infrastructure account listed below, as part of the capital improvement program. A total of $4,610,000 is budgeted for WW006 in 2020. The requested award is within budget.
Account Number |
Fund Description |
Total Budge Amount |
41251500-551502 |
Water Wastewater Fund |
$23,395,000 |
Per Council directive, contingency on construction projects is set at 3% on projects over $500,000 and 5% on projects under $500,000.