File #: 25-0158    Version: 1
Type: Procurement Award Status: Passed
File created: 1/31/2025 In control: City Council
On agenda: 2/18/2025 Final action: 2/18/2025
Title: Approve the award of Bid 24-198, Ogden Avenue and Washington Street Water Main Improvements, to Scanlon Excavating and Concrete for an amount not to exceed $4,879,939.50, plus a 3% contingency
Related files: 25-0488

CITY COUNCIL AGENDA ITEM

 

ACTION REQUESTED:
title

Approve the award of Bid 24-198, Ogden Avenue and Washington Street Water Main Improvements, to Scanlon Excavating and Concrete for an amount not to exceed $4,879,939.50, plus a 3% contingency

body

 

DEPARTMENT:                      Water Utilities

 

SUBMITTED BY:                     Darrell Blenniss, Director

 

BOARD/COMMISSION REVIEW:
N/A

 

BACKGROUND:

In support of the City’s priority to provide utility services that are reliable and safe, in December 2024, Water Utilities issued Bid 24-198, Ogden Avenue and Washington Street Water Main Improvements.  The project includes the replacement of water main on Ogden Avenue between Washington Street and Wright Street and on Washington Street between Ogden Avenue and Bauer Road. 

 

The purpose of the project is to replace aging and deficient water main on these streets.  The existing 4-inch and 6-inch cast iron water mains were installed in the 1920’s, 1930’s and 1970’s and will be replaced and upsized to 12-inch and 16-inch ductile iron pipe in accordance with City standards.

 

DISCUSSION:

 

Advertisement Date:

12/20/2024

Notices Sent:

274

Opening Date:

1/23/2025

Planholders:

42

 

 

Proposals Received:

6

 

Bids were received from the following vendors:

 

 

Base Bid

Bid Alternate A

Scanlon Excavating and Concrete

$4,879,939.50

$4,841,154.50

Acqua Contractors Corp

$5,350,000.00

$5,237,944.00

Engineer’s Estimate

$6,040,149.00

$6,040,149.00

Bolder Contractors

$6,674,527.00

$6,584,207.00

Performance Construction and Engineering

$6,848,788.00

$6,687,788.00

Swallow Construction Corp

$7,402,508.75

$7,291,234.75

Benchmark Construction

$7,638,000.00

$7,588,000.00

 

The bid documents for this project included a Base Bid to obtain pricing for ductile iron water main pipe and Bid Alternate A to obtain pricing for PVC water main pipe.  After evaluating the submitted bids, staff determined that selecting the lowest Base Bid was in the best interest of the City.  Ductile iron is the City’s standard water main material, and while PVC has been used in recent years due to substantial cost savings, the cost of ductile iron is once again competitive.

 

Scanlon Excavating and Concrete submitted the lowest base bid for the project at $4,879,939.50. The low bid is 19% lower than the budgeted amount of $6,360,000.

 

Water Utilities staff based the 2025 budget on the average per-foot cost for the last several years.  A favorable bidding environment and the timing of advertisement appear to contribute to the highly competitive bids received.

 

Staff believes the low bid submitted is reasonable for performing the work as specified.  Upon checking the references provided, staff finds Scanlon Excavating and Concrete to be a capable contractor.

 

The completion date for this project is October 31, 2025.

 

FISCAL IMPACT:

CIP#: WU403

 

Construction of the water main at Ogden Avenue and Washington Street is expensed to the Infrastructure account listed below. A total of $6 million is approved for the project construction in 2025. The award, including the contingency amount, is within the approved budget.

 

Account Number

Fund Description

Total Budget Amount

41251500-551502

Water Utilities Fund

$68,654,488

 

*Per Council directive, contingency on construction projects is set at 3% on projects over $500,000 and 5% on projects under $500,000.